Motorhome rebuild - day six

underfloor heat panels in motorhome

Day six sees the the laying down of aluminium backed underlay and on top of that heat panels are glued.  Connections are then soldered together.  It is a great feeling when the heat panels work - although with 27C outside they won't be needed for some time!  After that the floorboards are laid!  Other jobs include blocking the former boiler exhaust in the motorhome wall, reinforcing the bed supports from the garage, relaying vinyl in garage and moving both the spare wheel and gas cylinder to new positions in the garage.  But will the gas cylinder still be needed in the garage?